New




AED 4,490.00
Timing : 10 am to 9.00 pm (Monday to Saturday)
1-2 Working Days
Payment Methods:
TRIPP LITE PDUMNH32HVAT Monitored ATS PDU, Two 32A IEC309 32A Blue Inputs, 1 IEC309 32A Outlet
High-capacity 7.7kW PDU with ATS provides remote power monitoring and enables redundant power for non-redundant hardware. Digital display and Ethernet interface allow site power status monitoring for primary and secondary inputs, plus load level monitoring to prevent overload conditions.
* Two IEC 309 32A Blue (2P+E) inputs, each with 10-ft. (3.05 m) input cord
* One IEC 309 32A Blue (2P+E) output receptacle for connecting device or multi-outlet PDU
* ATS / Automatic Transfer Switching within 1-5 ms
* Pre-installed WEBCARDLX with latest version of PADM20 for enhanced remote management
* Digital display with LEDs for real-time status monitoring
When you place an order with us at www.altahericomputers.com, we will do our best to get your items shipped to you as soon as possible.
We currently ship only within UAE.
ONLY UAE ISSUED CARDS ARE ACCEPTED.
No account yet?
Create an AccountStart a Conversation
The team typically replies in a few minutes.